15 August 2008The “Plastimo” front foil furler drum system was installed on the forestay today. It looked good until subsequently when we tried to load the jib into the track it jammed halfway up due to the foil not being installed properly. (It was not until October that this was eventually rectified!)

No comments:
Post a Comment